Frequently Asked Questions

Below please find the answers to some questions that are frequently asked by customers and contractors.

Don't see the answers you're looking for? Email evcharging@eversource.com and an Eversource employee will get back to you as soon as possible.

General

At Eversource we are launching the deployment of both Level II and DC Fast Electric Vehicle Charging stations throughout our electric service territory in Massachusetts. We seek to accelerate the EV charging market, as well as support Massachusetts greenhouse gas reduction goals and facilitate the adoption of more EVs in Massachusetts by 2025.

The following criteria needs to be met before you can host an EV charging station.

  • You are a non-residential Eversource customer, or the owner/manager of a multi-unit building.
  • You own, lease or operate a site that provides long-dwelling time parking (two hours or more). This includes public parking areas, retail and mall parking, workplaces, colleges and universities, government properties and multi-unit dwellings.
  • Your parking lot is located at a site where Eversource owns the existing distribution infrastructure.
  • You can provide a license and easement to Eversource for construction and maintenance of the infrastructure that leads to the charging station.  
  • You are willing to purchase the electric charging stations as well as pay the associated costs of their connection to the infrastructure.

Please note, eligibility does not guarantee participation in the program.

You will own and operate the charging stations and be responsible for usage and maintenance costs. Eversource will own the infrastructure and be responsible for the maintenance of it.

As part of the Eversource EV charging station launch, we are interested in deploying our infrastructure at scale. To that end, we have developed the following three deployment types.

  • Level I (Up to five ports) - If you request two to five ports, the infrastructure will be put in place to support up to five single, or two dual and one single port stations.
  • Level II (Six to ten ports) - If you request six or more charging ports, the infrastructure will be put in place to support up to ten potential ports.
  • Level III (DC Fast Charging) - The infrastructure will be put in place to support one Level III dual-port station.

When making your decision, consider:

  • Who will use the stations? General public, employees, customers, residents or travelers?
  • How long will the stations be in use? Two plus hours, an entire workday, or a quick stop during a long trip?
  • The type of parking facility: commuter lot, retail/mall parking, public garage or workplace parking.

The charging station should be located close to the Eversource-owned electric equipment. Also keep in mind:

  • A charging station can be either pedestal or wall mount.
  • The charging station must be accessible to meet ADA requirements.
  • They should be located in an area providing adequate lighting for safety.
  • The charging station should be easily visible with ample signage pointing to its location.

No. The power for the stations comes directly from the Eversource service transformer. You won't use any electricity from your property's side of the meter.

Yes. The installation may overlap across more than one address. The infrastructure that Eversource deploys will have its own dedicated service and meter.

Process

You are responsible for procuring qualifying charging stations, from an approved vendor, within 30 days after the funding is approved for your site.

Eversource will manage and cover all related costs for the implementation of the infrastructure connecting to your chargers. This includes, but is not limited to, trenching, a transformer (if necessary), a dedicated service meter, panel(s), conduits and necessary wiring to support the approved number of charging stations.

Eversource will also coordinate all the work required, including the maintaining of safety barriers and management of pedestrian and vehicle traffic.

Once you have been approved and submit a proof-of-purchase for the charging stations, we estimate the deployment will take approximately three months. This assumes permitting, inspections and the installation of the charging stations are done in a timely manner.

Eversource will cover the cost of permits and inspects for the infrastructure on both our side and the customer side. Permits and inspections for the charge station installation will be covered by the charging station vendor or the customer.

Financial

You cover the cost of purchasing and installing the charging station(s).

The Massachusetts Department of Public Utilities approved $45 million for the deployment of electric vehicle charging stations in our service territory in Massachusetts. This investment supports the provision of the infrastructure for the charging stations.

This translates to supporting approximately 3,500 Level II and Level III (DC Fast charging) points at up to 450 business customer sites.

No. A dedicated circuit, metering and new charging stations(s) is required. Existing EV charging station installations would have to be managed and operated separately. 

Although the customer is responsible for paying the utility bill, there are several options for how electric vehicle users pay for the service of charging their car. These options vary from direct pass-through to charging by the hour.

Your charging station vendor will help guide you through the best billing option for you.