- Garvins to Deerfield (G146) Structure Replacement Project - Replacing 176 structures with weathered steel.
- Farmwood Substation to Webster Substation (F139 / V182) Simultaneous Line Rebuild Project - Replacing 289 structures and installing fiber optic cable.
- Berlin to Dummer (W179) Line Rebuild Project - Replacing 170 structures and installing fiber optic cable.
- Huckins Hill to Beebe River (Z180) Line Rebuild Project - Replacing 28 structures and installing new conductors.
- Beebe River to White Lake (B112) Line Rebuild Project - Replacing 256 structures and installing new conductors.
- Concord to Bow (P145) Line Rebuild Project - Replacing 165 structures and installing new conductors.
- Northumberland to Dummer (O154) Line Rebuild Project - Replacing 138 structures and installing new conductors.
- New Hampton to Holderness (E115) Line Rebuild Project - Replacing 185 structures and installing new conductors.
- Beebe River to Whitefield (X178) Line Rebuild Project - Replacing 570 structures with weathering steel structures of a similar design.
- Fremont to Stratham (H141 / A126 / R193) Maintenance Structure Replacement Project - Replacing 88 structures along three transmission lines.
- Webster Substation to Laconia Substation (J125 Line) Structure Replacement Project - Replacing 137 laminate wood monopole structures with weathered steel monopole structures.
- Greggs Substation to Jackman Substation (F162 / A164) Simultaneous Line Rebuild Project - Replacing a total of 229 wooden H-frame with weathering steel H-frame structures.
- Whitefield to Berlin (S136) Line Rebuild Project - Replacing 212 structures and installing new conductors.
- Littleton to Sugar Hill (U199) Line Rebuild Project - Replace 108 structures with weathering steel.
- Eastport to Tasker Farm (Y170) Structure Replacement Project - Replace or remove 70 structures with new weathered steel monopole structures.