Hingham Electrical Infrastructure Reliability Project
Why Are We Doing This Project?
We are proposing to build a new switching station in Weymouth to support a Hingham Municipal Lighting Plant (HMLP) project that includes constructing an underground electric transmission line and new substation to improve reliability and support the town’s electrification goals.
We are responsible for the construction and operation of the new switching station in Weymouth. HMLP is responsible for the construction and maintenance of the new underground transmission line and construction, maintenance and operation of the new substation in Hingham.
Where Is This Work Being Done?

The proposed switching station site and transmission line work is in an Eversource-owned transmission corridor, containing two overhead electric transmission lines and gravel access roads. The station's proposed location is near the parking lot and driveway for the Connell Memorial rink and pool.
Construction of the new switching station includes upgrading the existing access road and installing new equipment and infrastructure requirements.
About this project
- Location: Weymouth
- Switching station area: 2.5 acres
- Siting review by: Energy Facilities Siting Board (EFSB)
When Is The Work Being Done?
- Proposed start of construction: Q1 2027*
- Estimated in-service date: Q4 2028
*Subject to change, pending necessary approvals
Siting Review
To construct and operate the new underground transmission line, HMLP filed a petition with the EFSB for approval.
We both filed a second petition seeking zoning exemptions to construct the new HMLP substation and the new Weymouth switching station. The petition filings are part of the regulatory review process as defined by Massachusetts state statutes.
Visit the EFSB project page for a detailed project description, HMLP’s petitions, attachments and analysis, and periodic updates. Petition and attachment hard copies are available at the following locations:
- Town Hall town clerk at 75 Middle Street in Weymouth
- Tufts Library at 46 Broad Street in Weymouth
- Fogg Library at 1 Columbian Street in South Weymouth
Dates
- Initial EFSB filing: November 13, 2024
- EFSB Weymouth public hearing: March 25, 2025
- EFSB Hingham public hearing: March 31, 2025
- Weymouth Conservation Commission Order of Conditions: TBD
Documents
Community Outreach
We will continue engagement with town officials, residents, businesses, community groups and other stakeholders via municipal briefings, mailings and meetings to answer questions and listen to concerns.
As the proposed project proceeds through the permitting process and through construction, we will continue to keep stakeholders informed.
Past outreach efforts:
- Open house at Union Towers I in Weymouth (January 25, 2024)
- Open house at Union Towers II in Weymouth (January 26, 2024)
- Pop-up event at Jimmy’s Diner in Weymouth (March 11, 2024)
- Open house at Crossroads Worship Center in Weymouth (March 19, 2024)
Have Questions?
Keeping the lines of communication open is an important part of our work in your community, and we welcome your input.