Line 112 and Crystal Spring Substation
Why Are We Doing This Project?
We determined after an extensive study, that integration of additional clean energy into the electrical grid in the Marion-Fairhaven area requires an approximately three-mile extension of Line 112, an existing 115 kV overhead transmission line between Mendall Road in Acushnet and the Crystal Spring substation in Mattapoisett.
This work is part of a larger initiative focused on electric system enhancements to maintain reliability and enable distributed energy resource (DER) facilities to safely interconnect and operate.
Where Is This Work Being Done?
The new line extension will occur from Acushnet to Mattapoisett.
- An existing 115-kilovolt (kV) line that currently passes by Mendall Road in Acushnet will be tapped and extended by 3 miles in the existing right-of-way to the Crystal Spring Substation in Mattapoisett. This extension will cross Mendall Road in Acushnet, Long Path Road, Tinkham Lane, Riverbend Lane and Crystal Spring Road in Mattapoisett.
Upgrades to our Crystal Spring substation at 26R Crystal Spring Road in Mattapoisett will include:
- Existing transformer will be replaced and a second transformer will be added; new metal clad switchgear, upgraded ancillary equipment and two new capacitor banks will be installed.
- Five new transmission poles will be installed adjacent to the station.
- Fence perimeter will be expanded to accommodate upgraded equipment.
When Is The Work Being Done?
- Proposed start of construction: Q4 2024
- Estimated in-service date: Q4 2026
*Subject to change, pending necessary approvals
About this project
- Route length: 3 miles
- Line voltage: 115 kilovolts (kV)
- Siting review by: Department of Public Utilities (DPU)
For more information, download a project fact sheet. (PDF)
Siting Review
Dates
- Filed petition with DPU: June 4, 2024
- DPU public hearing: September 26, 2024
- Petition decision from DPU: Pending
Documents
All files are PDF format.
- Notice of Public Comment Hearing (Portugese)
- Line 112 and Crystal Spring Substation filed DPU petition
To view additional information filed in the DPU proceeding, visit the DPU website and search docket 24-93/24-94.
Community Outreach
We are engaging town and city officials, residents, businesses, community groups, and other stakeholders via municipal briefings, open houses, mailings, and meetings to answer questions and listen to concerns. As the proposed project proceeds through the siting and permitting process, we will keep you informed.
Past open houses include:
- Mattapoisett Fire House in Mattapoisett (April 11, 2024)
- Virtual Open House (April 16, 2024)
- American Legion Post in Acushnet (April 18, 2024)
View our open house presentation (PDF).
Have Questions?
Keeping the lines of communication open is an important part of our work in your community. We welcome input from the community.
For more information about this project, please call the project information hotline at 1-800-836-0302 or email ProjectInfoMA@eversource.com.
Perguntas? Traduções? Envie um e-mail para a Eversource pelo endereço ProjectInfoMA@eversource.com ou ligue para 833-836-0302.
¿Tiene preguntas? ¿Traducciones? Envíe un correo electrónico a Eversource a ProjectInfoMA@eversource.com o llame al 833-836-0302.