Line 112 and Crystal Spring Substation
Line 112, an existing 115-kilovolt (kV) line in Acushnet, will be tapped and extended by three miles, and Crystal Spring Substation upgraded.
Information on this page is for customers in
{{ town-name }}
The Marion-Fairhaven area (Marion, Fairhaven, Acushnet, Mattapoisett and Rochester) is chosen as one of six regions in Massachusetts that need electric system enhancements to maintain reliability and enable distributed energy resource (DER) facilities to safely interconnect and operate.
The upgrades needed in this area include:
If all six groups of projects are approved, that would enable the integration of approximately 1 gigawatt (GW) of solar energy needed to help Massachusetts achieve its net-zero carbon emissions goal by 2050.
This DPU docket 22-47 was approved on December 30, 2024. Visit the DPU website for docket details.
Projects pages will be added as needed.