fpo-masthead

Important Documents

A collection of important reference material for builders and contractors working on Eversource's Eastern Massachusetts electric and gas infrastructure.

Electric & Gas Documents

Standards Documents

The following documents detail the preferred construction methods and materials for construction projects interacting with our electric infrastructure.

Design Standards

Construction Standards

Material Standards

Work Standards

Manufacturers Lists